Weekly Renders

Motion Etude: 02 Workflow: 10-hour sprint (Production + Render + Edit). Tech: Blender, After Effects. Disclaimer: Personal project (Fan Art). Not affiliated with EXM Manufacturing. Credits: • Product Model: Industrial Handle by EXM Manufacturing

Motion Etude: 01
Workflow: 8-hour sprint (Production + Render + Edit).
Tech: Blender, After Effects.
Disclaimer: Personal project (Fan Art). Not affiliated with JBL.

Motion Etude: 03 Workflow: 16-hour sprint (Production + Render + Edit). Tech: Blender, After Effects. Disclaimer: Personal project (Fan Art). Credits: Special thanks to Dilip Gattu for the Study Lamp model (https://grabcad.com/library/study-lamp-4).

Weekly Motion Design Etudes & R&D.